From sheathing assessment through fan rerouting and ventilation correction — the full above-ceiling mold scope for Hines, IL properties.
Assessment
🔍Sheathing Assessment & Sapstain Distinction
Section-by-section sheathing assessment: MC% readings, visual characterization of growth pattern, and targeted lab sampling where species or activity status is uncertain. Structural assessment of OSB and plywood sheathing for delamination or through-penetration. Sapstain documented separately from active mold growth.
Ventilation
💨Soffit Vent Clearance & Ridge Vent Assessment
Eave bay clearance and baffling, ridge vent condition assessment, vent addition where NFA is insufficient. All specified in the written scope with the reason for each correction.
Fan Rerouting
💨Exhaust Fan Rerouting to Exterior
Improperly terminated fans rerouted to exterior. Insulated duct, exterior cap, sealed connections. Typically same-day correction in coordination with the mold treatment.
Treatment
🌳Borate Treatment & Encapsulant Application
HEPA vacuum then borate application on all accessible surfaces. Encapsulant application over treated surfaces where additional barrier is warranted. Both documented in the written scope.
Replacement
🔨Sheathing Replacement Where Structurally Needed
OSB and plywood sheathing sections with confirmed structural delamination, loss of rigidity, or through-penetration of decay fungi are flagged for replacement in the written scope — individually assessed rather than assumed. Replacement work coordinated with roofing contractor when the roof covering must be removed for access.
Clearance
✅Post-Remediation Clearance & MC% Verification
After treatment and ventilation correction, post-remediation sheathing MC% readings verify material is below threshold. Independent post-remediation air sampling from within the attic and from living spaces below confirms reduced spore counts in both zones. Written clearance report delivered.